How it works
From upload to citation-anchored report.
Typical pre-check completes in ~30 minutes for an 80-sheet residential set.
- 01License verificationBefore you can upload, we verify your HI architect or engineer license against the State DCCA roster. Non-licensed users cannot place an order.
- 02Upload plan setDrop a single PDF (cover + site + floor + elevations + sections, up to ~80 sheets). The system splits it into per-page images at 300dpi.
- 03Sheet classificationA fast routing pass classifies each sheet — site plan, floor plan, elevation, section, structural, MEP, schedule, detail.
- 04Attribute extractionA vision pass reads each sheet for measurable attributes: setbacks, FAR, lot coverage, heights, egress paths, occupancies. Every extracted value records its source sheet and coordinate.
- 05Compliance checkEach extracted attribute is compared against the parcel's zoning rules and applicable code. Hits become flags with confidence scores.
- 06Citation validationEvery flag's code quote is exact-matched against the source corpus before publication. Unverified quotes are held for review — never shipped with a guess.
- 07AE reviewYou receive a report in your dashboard. Review each flag, dismiss what doesn't apply, request a variance draft on what does. Download the final PDF when ready.
- 08You fileTake the report and your stamped drawings to DPP — or skip the queue via your SCP. Ikena Permit never touches the AHJ.