Find DPP's correction list before DPP does.
Ikena Permit reads your plan set and returns every probable ROH §16, IBC, and Honolulu LUO violation — with verbatim section citations — in about 30 minutes. The same issues a plan checker flags. Found before you submit, not six weeks after.
Founding architect rate · first 20 scans
No filing. No DPP contact. You stay the architect or engineer of record.
Every resubmission cycle burns 2–4 weeks and direct coordination time. Catching a setback violation before submission costs $199. Catching it after costs a project schedule.
Built in Honolulu. Made for Hawaii practice.
Ikena Permit is a product of Ikena Design & Build LLC, a Honolulu-based design studio. We have worked inside Hawaii's permitting system long enough to know exactly where plan-check comments come from — and we built the tool we wished existed.
The AI reads your drawings visually, the same way a plan checker would. The corpus is ROH Title 21 (Land Use Ordinance), ROH §16 (Building Code), and IBC 2018 — not a generic mainland code tool with Hawaii notes appended.